MARCH 2025

Arroyo Grande, CA

Project Summary

When building his new home in Arroyo Grande, this homeowner initially needed a solar system to meet California’s Title 24 energy efficiency requirements. However, his vision extended beyond compliance—he wanted full energy independence. To achieve this, he opted to increase the system size for complete energy offset and ensure full backup power during outages. Viva Energy delivered with a robust 16.56 kW ground-mounted solar array paired with 28.6 kWh of battery storage, providing long-term energy security and peace of mind.


Technical Specs

Location: Arroyo Grande, CA

System Specs: 16.56kW Ground mount with 28.6 kWhr energy storage

Equipment: REC panels with EG4 inverter and batteries

Previous
Previous

San Luis Obispo, CA